Leica Tcr805 Total Station User Manual Work [ Direct Link ]

or output via a serial interface (RS-232) to an external recorder or PC for post-processing. Carlson Software Key Programs & Applications

: Connect to a PC or data collector via the RS-232C serial interface.

Workflow A: Station Setup and Orientation (Resection vs. Known Point) leica tcr805 total station user manual work

: Begin by securing the instrument to a tripod and leveling it electronically typically comes standard with a laser plummet for easy centering over a control point. Measurement Modes : The instrument features two main EDM modes: IR (Infrared)

for seamless data exchange between the total station and your computer. www.surveyteq.com or output via a serial interface (RS-232) to

Re-level the instrument using the foot screws and check your station backsight setup again. Internal voltage dropped below operating threshold.

: Verify the red laser dot matches the ground point exactly. Slide the instrument across the tripod head to adjust if necessary, then re-verify level. 3. Job Creation and Station Orientation Known Point) : Begin by securing the instrument

Select your : Prism for standard targets or RL (Reflectorless) for shooting directly at structures, walls, or inaccessible points. 4. Step-by-Step Surveying Workflows

: Use the physical circular bubble for rough levelling, then the digital level bubble on the screen for precise adjustment until three "thumbs up" icons appear.

Plant the tripod firmly over the ground control point (survey monument).

Scroll to Top